I have a client upgrading from ECC 5 to ECC 6. They will be doing the upgrade while they are on Windows 2003 Servers and SQL Server DB 2005.
After the ECC Upgrade they plan to migrate to VM Ware running Windows Server 2008 and SQL DB 2008
How long should the migration take and what are the issues I need to watch out for?